• Home
    • The Company
      • Professional Staff
        • Map and Directions
        • Service Lines
        • Project Experience
          • HSRA Services
            • RCRA and Hazardous Waste
              • Soil & Groundwater Investigation
                • Soil and Groundwater Remediation
                  • Phase I & II Site Assessments
                    • Emergency Corrective Action
                      • Landfill Closures
                        • Wastewater Treatment
                        • Achievements
                          • Kerr-McGee
                            • AFLAC Aviation Hangar
                              • AFLAC Former C&C Convenience Store
                                • WestPoint Stevens, Valley, Alabama
                                  • National Park Service, Blue Ridge Parkway
                                    • Confidential Client
                                      • ABC Compounding, Inc.
                                        • Internal Revenue Service
                                          • Clarke County School Bus Maintenance Facility
                                            • GRUMA Corporation
                                            • Newsletter
                                            • GSA Contract
                                            • Contact Us
                                            Atlanta Environmental Management, Inc.

                                            Emergency Corrective Action

                                            Picture
                                            AEM has assisted clients in those situations where extensive planning and negotiation is not possible in order to address emergency conditions and imminent dangers, those situation where rapid response and remedy is required.  AEM’s many years of experience have prepared our staff to take the “right”  actions at the “right” times under emergency conditions, and can help prioritize decisions and communications while maintaining compliance with environmental regulations.  We understand that there are times when resources have to be applied to correct an emergency situation, while also recognizing that merely “throwing bodies” at an episode is not necessarily the best or wisest move.  AEM has the depth of personnel and maintains its testing equipment in good working order so that we can “hit the ground running” when called.             


                                            Fuel Oil Spill - Savannah, Georgia
                                            AEM performed emergency corrective action for No. 2 fuel oil-contaminated soil and free liquids in an area adjacent to a 400,000-gallon above-ground No. 2 fuel oil storage tank. During a three-day period, AEM was responsible for the immediate development of the corrective action plan and implementation of the cleanup of contaminated soil and free liquids at the site. The tank is located approximately 100 feet from a major coastal waterway.

                                            The fuel oil tank is located within an earthen secondary containment diking area covered with an impermeable synthetic liner. A drainage pipe equipped with a valve was used to release storm water that collects inside the containment area. Subsequent to a heavy rain, the facility's staff noted a release of fuel oil caused by the valve that apparently clogged and released rainwater mixed with oil. It was critical that the contamination be removed as quickly as possible, due to the proximity to the Savannah River.

                                            AEM immediately implemented corrective action to address the oil release. The corrective action included the 1) excavation of visibly contaminated soil, 2) removal of free-floating fuel oil on the standing water in the drainage ditch, 3) proper off-site transport and disposal of the excavated soil as a special waste, 4) re-grading the excavated area with clean fill, and 5) re-vegetation of the area using native flora. AEM documented the sealing of the stormwater release pipe so that any future storm water that collects in the containment will be manually pumped from the containment area for disposal or treatment.

                                            AEM successfully achieved all goals regarding the emergency response activities to the fuel oil spill. The stormwater release pipe was repaired to prevent future releases from the fuel oil containment area. The contaminated soil and free liquid fuel oil were removed from the release area. Due to the expedient cleanup, the adjacent area was not impacted by the fuel oil release. The removal of the contaminated soil and free liquids also eliminated the possibility of gradual subsurface migration of fuel oil contaminants in the critical area near the river. A "No Further Action" (NFA) was issued by the regulatory agency.